It s best to stagger the joints in each successive course to avoid noticeable patterns.
Course strip on siding.
Staret strip secures the first course of siding to the home.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Most suppliers sell two sizes of starter 2 1 2 in.
This strip will tip the first piece of siding to the proper angle.
How to stagger lap siding for walls longer than 12 feet you ll need to butt additional lengths of siding together.
A strip of wood that seals joints in wooden siding.
You can make your own fiber cement starter strip by ripping a piece of hardieplank lap siding into 1 1 4 inch strips.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Measure and cut to length the first piece of siding and nail it in place photo 7.
What i do is replace them from the bottom up.
Modern board and batten siding refers to the old wood siding that had boards and battens to fill the gaps between the boards.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Be sure to center the nails in their slots to.
The last one that goes between the new work and the old work can be face nailed with hardiplank just nail it off near the edge of the strip above countersink the heads and caulk the nail heads to hide them.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
Constructed of low maintenance durable vinyl.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
It protects the sheathing from rain snow and pests.
Each course except the last one can be nailed normally.
Snap each length of siding in place so that its bottom lip hooks under the starter strip.
Thick treated wood starter strip along the bottom of the wall above the foundation.
Required accessory for starting a vinyl siding job.
Remember that these layout lines represent the top of each siding course.
Butt joints in adjacent courses should be spaced apart by at least two stud bays for 16 inch o c.
Framing or one bay for 24 inch o c.
Slide it into the corner and nail it every 16 in.
Ask this old house general contractor tom silva helps a homeowner repair sections of his vinyl siding that have holes.
This video shows how to install a starter strip for vinyl and polymer siding installation.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Backed by ply gem s limited lifetime warranty.